Poultry mortality planning calculator
Estimate total grow-cycle mortality mass and electricity cost, then discuss the real daily loading pattern with MAOF.
MAOF PLANNING TOOL
Live estimatePoultry mortality planning calculator
0.45 kWh/kg baseline. A reliable, continuous electrical supply is required for the entire processing cycle.
Estimated electricity cost
$397for one 42-day broiler grow cycle6,000mortalities
6,300 kgtotal cycle mortality mass
2,835 kWhelectricity
2,520 kgtarget output
Machine sizing
Confirm the real daily loading pattern.
Mortality mass is not distributed evenly through a broiler cycle. Early mortality may involve more birds at very low body weights, while later mortality may involve fewer birds weighing 2–4 kg. A straight-line daily average is not suitable for machine selection.
2250L300–1,350 kg1500L200–900 kg500L75–250 kg250L50–150 kg
This calculator provides an initial estimate only. Machine selection and loading frequency must be confirmed with MAOF using the operation’s actual mortality pattern and bird weights.
Discuss machine sizing with MAOF